Planning an office fit-out: a practical checklist

A good fit-out starts well before work begins on site. This checklist covers the brief, approvals, timeline and handover points that keep a project on track.

October 26, 2026
·
3 min read
Interior fit-out in progress (illustrative image)

Partitions, ceilings, carpentry, flooring and finishes are only part of a fit-out. Most of the decisions that keep a project on time and on budget are made before anyone arrives on site.

1. Set a clear brief

List how the space needs to work: the number of workstations and rooms, storage, pantry, reception and any special areas. Include must-haves and nice-to-haves so priorities are clear if the budget is tight.

2. Agree a realistic budget

Allow for design, construction, furniture, IT and cabling, moving costs and a contingency for items found once work starts.

3. Read the landlord's fit-out guidelines

Most buildings have their own rules on approved working hours, noise, deliveries, deposits, insurance and the drawings they need to see. Some works may also need approvals or submissions to the relevant authorities, prepared by a qualified person where required.

4. Plan the timeline

Work back from the move-in date. Allow time for design, approvals, ordering materials with long lead times, the works themselves, defects rectification and cleaning before handover.

5. Think about services early

Lighting, power points, air-conditioning, data cabling and fire safety items such as sprinklers and detectors are affected by new layouts. Checking these early avoids costly changes later. Changes to fire safety provisions, electrical installations and other regulated works must be designed, carried out or endorsed by appropriately qualified or licensed parties, and the required approvals obtained before the affected works proceed.

6. Handover and the end of the lease

Agree how defects will be recorded and rectified, and collect drawings and warranties at handover. Check your lease for reinstatement obligations, as you may need to return the space to its original condition when you leave.

Getting started

Share your floor plan, brief and target dates, and we can talk through the scope. Our Renovation, Interior & Finishing Works page explains the work we cover, including partitions, ceilings, carpentry, plastering and tiling.